To migrate virtual tours between platforms, separate the original media from the editable project and from the links visitors already use. Panoramas may be reusable while navigation, hotspots, forms and platform-specific settings need rebuilding. Plan those differences before closing the old account or replacing a live embed.
This guide covers an inventory, a small migration pilot and a controlled changeover. SVT room, navigation, information-point and publishing documentation, together with Google's site-move guidance, were reviewed on 15 November 2026. It is a planning and verification workflow, not a claim that an arbitrary third-party project can be imported into SVT or that a customer migration was performed.
Decide what you are moving
Moving a published viewer to another host is different from moving an editable project into another editor. The first may preserve an existing web output; the second requires a compatible importer or a rebuild. Moving the whole editing application, database and configuration is another operation again.
Write down the intended deliverable: a working visitor experience, continued editing access, client accounts or an independently recoverable installation. Do not assume one archive supplies all four. The export and handover guide covers packaging; this article focuses on the decisions and checks across the move.
Inventory the source before changing access
Create one record for each tour, with a stable project identifier and a named owner. Record the source platform, relevant release or account plan, intended destination, current visitor entry point and the person who will approve the replacement.
- Original panoramas: filenames, dimensions, room identifiers, capture dates and the location of the highest-quality originals. Distinguish originals from generated previews or tiles.
- Navigation: starting scene, initial direction, room connections, arrival views, return routes and any scene-specific links distributed outside the tour.
- Hotspots and media: labels, descriptions, images, audio, video, documents, external destinations and the scene associated with each item.
- Presentation and access: logos, approved colors, room names, languages, floor plans, map points, password protection or access rules and publication schedules.
- Operations: forms, notification destinations, third-party services, analytics configuration, hosting responsibility and the account access needed for maintenance.
- Published references: website embeds, client pages, listing portals, email links, QR codes, social posts and any branded addresses or redirects.
Keep credentials outside the public migration record. Capture screenshots or a screen recording of the old route while it still works, but do not treat those references as replacement source panoramas. Confirm that you can retrieve and reuse the necessary media under the applicable account and content permissions.
Sort each item into transfer, rebuild or replace
Reusable files are not a portable project
Original panoramic images, approved text and media can often be reused when you have the files and the destination supports them. Check image projection, dimensions, codecs and file-size limits. A folder of cube tiles or a low-resolution preview may not be equivalent to an original full-sphere panorama. See the file-format guide for the distinction between source media and delivery output.
A standalone web export may remain useful for hosting the existing viewer, subject to its requirements and license. It does not establish that another editor can import the editable room graph or preserve every feature. Use a native project-import path only when the receiving product documents the exact package and version compatibility, then prove it with a sample.
Expect platform-specific behavior to need attention
Hotspot coordinates, room identifiers, menu skins, floor-plan assignments, forms and access settings may use different representations. Record what each feature does, not just where its button sits. Recreate the intended behavior where supported, choose an approved alternative where it is not, and identify anything that cannot be carried over.
Do not assume historical analytics, collected inquiries or customer accounts move with the panoramas. Check available exports and destination import support separately. Keep any required records through an appropriate private process; do not copy them into public viewer files.
Prove the destination with a small pilot
Select one representative tour that includes the features you depend on. A useful illustrative pilot has reception and gallery panoramas, a link between them in each direction, a brochure information point and an inquiry action. These are example requirements, not a report of a completed transfer.
- Make a separate staging copy and record the source version being used. Keep the old published tour available during the pilot.
- Import only through a documented compatible path, or upload the original media and rebuild the project. Preserve the inventory identifiers in your working record even if the new editor assigns different internal identifiers.
- Restore room names, starting view, arrival directions and return navigation. Compare the route with the source recording.
- Recreate each information point, media action and approved external destination. Reconfigure forms, notification delivery and access controls instead of assuming their settings transferred.
- Test the visitor experience outside the editor session, both directly and in its intended website embed. Record missing functions, accepted alternatives and unresolved problems before moving more tours.
If Simple Virtual Tour is the destination
The documented manual route starts with adding room panoramas, then connecting rooms with markers and adding information points. SVT's room tutorial describes JPG or PNG image input with a 2:1 ratio for spherical panoramas. Confirm that the source contains a complete sphere; the ratio alone does not establish that.
Rebuild the route using the marker workflow, checking destinations, arrival views and a way back. Configure contextual content with the information-point tutorial. These are documented authoring steps, not a universal converter for another platform's project format. Check controls against your installed release and account.
Plan the fate of every old visitor link
Make a mapping from each old public entry point to its intended replacement. Include the owner of the old address, the destination, where the link was distributed and how you will verify it. Keep a separate mapping for room-specific entry points: a new tour opening successfully at reception does not prove an old gallery link still reaches the gallery.
- Address you control: preserve the branded entry page or arrange an appropriate redirect after the replacement is approved. Maintain its domain, HTTPS and hosting as required.
- Provider-owned address: ask which redirection or continued-viewing options actually exist. If you cannot change the old address, document that limitation and replace references you can control.
- Embedded viewer: update the host page's embed and any fallback visitor link. The old iframe source does not move merely because the new tour has similar content.
- Printed QR code: check the exact encoded destination. A code pointing to a controlled redirect may remain useful; a code pointing to an unavailable provider URL cannot be changed by editing the new tour.
Test the old links from their actual distribution points, including query parameters or scene references where used. A redirect to the new tour cannot by itself translate proprietary scene identifiers. The embedding guide covers the separate host-page checks.
When public web addresses change
For a permanent move of public pages, Google's site-move guidance recommends mapping old addresses to relevant new pages and using permanent server-side redirects where possible, such as 301 or 308. Avoid redirect chains and unrelated destinations. Update controlled links and sitemaps, and check that the new public pages can be indexed as intended.
The same guidance recommends retaining redirects for at least a year; distributed visitor links may need support longer. This does not mean you can configure a redirect on a provider's domain without its cooperation, or that rankings will stay unchanged. Access restrictions for private tours still need to be preserved.
Validate the rebuilt tour and the distribution path
Use an acceptance record with the source item, target item, expected behavior, observed result, owner and decision. Mark a feature complete only after checking its actual outcome. Keep a missing function visible in the record rather than silently replacing it with a button that does nothing.
- Compare every panorama, room name and language, including initial orientation and return routes.
- Open each hotspot, media item, floor-plan point and external destination. Check that protected material remains protected.
- Test forms through the intended submission and notification path. Confirm receipt rather than relying on an on-screen success message.
- Open old public entry points and inspect the response, any redirect destination and the final tour. Check scene-specific entry behavior separately.
- Test the saved embed, fallback link and relevant phone and desktop browsers. Inspect missing assets, blocked framing and external-service dependencies.
The SVT publishing tutorial separates the visitor link, embed, status, protection and scheduling controls. Review each applicable layer after rebuilding; keeping the same display title does not preserve the old access rules or address.
Switch in an agreed window and keep a recovery route
Before changing live links, pause editing or reconcile changes made since the pilot. Save the final source inventory, approved destination version and outstanding issues. Agree who changes the embeds or redirects and who verifies the result immediately afterwards.
Keep a usable source copy and document how to reverse the delivery change where possible. Permanent redirects can be cached, so do not assume that reverting one server rule instantly reverses every visitor's path. Do not close the source account until you have confirmed the agreed replacement, ongoing link responsibilities and access to required archives.
Monitor delivery errors and contact requests after the changeover, then record the final handover. Treat recovery of the application separately from viewer delivery: a standalone archive is not automatically a backup of the editing database or configuration. The Cloud and Self-Hosted comparison explains the responsibilities to assign.
Frequently asked questions
Can I move a complete tour just by copying its link?
A visitor link points to a hosted experience. It does not supply the original panoramas or an editable project. Obtain the appropriate files and verify a supported import or rebuilding workflow.
Does a ZIP export work in any virtual tour editor?
No. An archive describes packaging, not a universal project format. Its contents may be published viewer files, a product-specific project package or another deliverable. Check the exact receiving workflow before relying on it.
Can old QR codes keep working after migration?
Only if their encoded destination remains usable or can be redirected appropriately. If the old address is outside your control and stops working, you may need to replace the printed codes.
Will the tour look and behave exactly the same?
Do not promise identical behavior across different editors. Preserve the information and visitor tasks, test the new implementation and obtain approval for any changed interface or unsupported function.
Move the visitor experience, not just the image folder
A reliable migration accounts for source files, room relationships, information points, operating dependencies and distributed links. Inventory first, prove one representative project, validate the replacement and agree the changeover before retiring the source.
Explore the Simple Virtual Tour demo when assessing a destination workflow. Review the current Simple Virtual Tour options once you have identified the required authoring functions, hosting responsibilities and reconstruction work.